Customer Pain Points
Warehouse automation requires equipment selection, flow, interfaces, deployment, scaling and service planning, not just isolated equipment.

APPLICATIONS
Configure the 3D Sorter Series around space, item profile, order rhythm and interfaces, connecting identification, induction, collection and packing. Agree equipment and system scope during solution design.
Evaluate item profiles, destinations, peaks, site constraints and system interfaces in one plan.
Business-system integration
Two-way data coordination
Configuration and control
Operating Flow
Warehouse automation requires equipment selection, flow, interfaces, deployment, scaling and service planning, not just isolated equipment.
Configure the 3D Sorter Series around space, item profile, order rhythm and interfaces, connecting identification, induction, collection and packing. Agree equipment and system scope during solution design.
Warehouse automation fits customers moving from isolated equipment to systematic warehouse flow improvement.
Product Selection
| Scenario | Recommended product | Why it fits | Key metrics |
|---|---|---|---|
| High-throughput, multi-layer continuous sortation | 3D Sorter M | Multiple carts per column and large roll-cage chutes; direct manual induction or project-specific automatic induction. | Mechanical: 40,000 pcs/h · 200 customizable roll-cage chutes |
| Standard parcels and multi-destination sorting | 3D Sorter | Lifting single- or dual-cart-per-column structure, multiple chute formats, modular combinations and split-line operation. | Mechanical: 24,500 pcs/h · 1,000 customizable chutes |
| Non-conveyable, envelope and flat items | 3D Sorter E | For complex express and postal items, integrating induction through delivery to reduce manual NC re-sorting. | Mechanical: 31,000 pcs/h · 1,500 customizable chutes |
| Chute expansion, store replenishment and returns | 3D Sorter X | Adds chutes to the standard 3D Sorter in phases, with extension planned around the existing configuration and site conditions. | Mechanical: 11,000 pcs/h · 2,500 customizable chutes |
Automation planning assesses equipment, flow, interfaces, deployment and service boundaries together.
The output combines site reality with a path from configuration to delivery and service.
Next Step
Share site size, parcel profile, peak volume and destination flows for a specific product, chute, induction and integration recommendation.
Discuss Your Project