The Short Answer
Projects move through requirements review, solution design, production testing, installation and commissioning, and acceptance and training. Timing depends on equipment, site readiness and integration, and is agreed during planning. Installation time is not the full project lead time.
02
From Survey to Go-Live
A complete delivery typically includes these stages:
- Requirements review: confirm operations, site conditions and scope.
- Solution design: plan equipment, layout and workflow.
- Production testing: manufacture, assemble and perform factory tests.
- Installation and commissioning: install, integrate and trial the system.
- Acceptance and training: agree acceptance criteria, train operators and hand over.
03
Factors Affecting the Timeline
Chute and induction configurations, site modifications, integration depth, identification commissioning and site coordination all affect delivery. Confirm equipment areas, interfaces and acceptance criteria early to coordinate each stage.