01
The Short Answer
A sorting system must connect orders, chute assignment and sorting-result feedback with WMS/ERP/MES to close the loop. Tegene supports integration with WMS, ERP, MES and conveyors, completing system integration around on-site workflow.
02
Data to Connect
A complete integration typically involves these data flows:
- Order and wave release: WMS releases orders to sort with destinations/flows.
- Chute assignment: the sorting system assigns dynamically by flow and chute configuration.
- Sorting-result feedback: completion, exception and full-chute information returns to WMS/ERP/MES.
- Equipment and capacity status: throughput, accuracy and device status are reported for monitoring.
03
Steps and Common Pitfalls
Proceed with these steps and avoid common issues:
- Map the interface list and data fields first to avoid rework after go-live.
- Confirm the identification and induction methods selected for the project to reduce exceptions.
- Reserve cooperation boundaries for conveyors, custom automation and local integrators.
- Design exception and full-chute handling to avoid on-site flow stalls.

